View Single Post
Old 10-08-2012, 02:57 PM   #27
BMRbrnSNRbrd
Cummins Member
 
BMRbrnSNRbrd's Avatar
 
Join Date: Aug 2011
Location: Norman
Age: 39
Posts: 4,051
Default

Answer from Matt about the header timeline:

OK, these have already been sent in for chrome plating and ceramic coating. This process will take about a week, then a week to box everythig up and have them ready to ship. End result, these are expected to ship the week of the 22nd or the 29th. They said they wont know an exact date until they get them back from having them coated.
I want them so bad but my need for instant gratification is really killing me. I've even thought about it and tried to come up with something in the same price range that would be just as good and I can't.
__________________
BMRbrnSNRbrd is offline   Reply With Quote